1.3.3
Structure No. 2
1.3.3.1
Payment
Payment will be made for costs associated with operations necessary for
construction of the structure at Station YY+YY.
1.3.3.2
Unit of Measure
Unit of measure:
lump sum.
1.4
UNIT PRICE PAYMENT ITEMS
**************************************************************************
NOTE: Unit price payment items should be used only
where appropriate under the guidance of Federal
Acquisition Regulation (FAR) Part 36 - Construction
and Architect-Engineer Contracts paragraph 36.207.
The Unit Price payment items shown below are for
illustration purposes only. Unit price payment item
language must be written specifically for each job.
Unit price payment item language appropriate for
inclusion below is contained in guide specification
sections and must be moved to this section to
develop the pay items for the project.
**************************************************************************
Payment items for the work of this contract on which the contract unit
price payments will be made are listed in the BIDDING SCHEDULE and
described below. The unit price and payment made for each item listed
shall constitute full compensation for furnishing all plant, labor,
materials, and equipment, and performing any associated Contractor quality
reports, and for performing all work required for each of the unit price
items.
1.4.1
Excavation
**************************************************************************
NOTE: Since there is no UFGS Guide Specification
for Civil Works "Excavation", this example was taken
from a job specification.
**************************************************************************
1.4.1.1
Payment
Payment will be made for costs associated with excavation for the channel
and for the structure, which includes performing required excavation and
other operations incidental thereto, Contractor-furnished disposal area(s)
and disposition of excess excavated material and unsuitable and frozen
materials.
1.4.1.2
Measurement
The total quantity of excavated material for which payment will be made
will be the theoretical quantity between the ground surface as determined