Contractor shall prepare a report containing results of the field test.
3.4.5
Test Oversight
Tests are subject to oversight and approval by the Contracting Officer.
3.4.6
Test Reporting
Before scheduling the performance verification test, furnish field test
documentation and written Certified Statement of Field Test Completion to
the Contracting Officer for approval. The statement, certified by the
two-way radio data transmission system provider, states that the installed
system has been tested and is ready for the performance verification test.
Do not start the performance verification test prior to receiving written
permission from the Government. During and after completion of the Field
Tests, and again after the Performance Verification Tests, identify,
determine causes, replace, or repair equipment that fails to meet the
specification, and submit a written report to the Government. Document all
tests with detailed test results. Explain in detail the nature of each
failure and corrective action taken. Provide a written report containing
test documentation after the Field Tests and again after the Performance
Verification Tests.
3.4.7
Verification Test and Endurance Test
The two-way radio data transmission system shall be tested as a part of the
completed UMCS during the Performance Verification Test and Endurance Test
as specified in Section 13801 UTILITY MONITORING AND CONTROL SYSTEM (UMCS).
-- End of Section --