follows:
3.1.8.1
Combined Ice and Wind Loading
Radial thickness of ice: [_____] mm inch
Horizontal wind pressure: [_____] Pa psf
Temperature: [_____] degrees C degrees F
Constant to be added to the resultant: [_____] N/m psf
3.1.8.2
Extreme Wind Loading
Velocity pressure exposure coefficient, wire:
[_____]
Basic wind speed: [_____] m/s mi/h
Gust response factor, wire: [1.0] [_____]
Importance factor: [1.0] [_____]
3.2
TESTING
**************************************************************************
NOTE: The section number and title of the
appropriate specification must be inserted.
**************************************************************************
3.2.1
General
all testing shall be provided.
3.2.2
Contractor's Field Test
The Contractor shall verify the complete operation of the data transmission
system during the Contractor's field testing as specified in Section 13720A
ELECTRONIC SECURITY SYSTEM, where applicable. Tests of video coaxial cable
shall include testing each circuit for continuity and verification that
each circuit passes a full bandwidth signal that complies with EIA 170. A
report containing results of the field test shall be prepared and submitted.
3.2.3
Performance Verification Test and Endurance Test
The coaxial data transmission system procured and installed as part of a
complete system shall be tested as a part of the completed system during
the Performance Verification Test and Endurance Test as specified in
Section 13720A ELECTRONIC SECURITY SYSTEM, where applicable.
-- End of Section --
SECTION 16794A
Page 27