SD-03 Product Data
Spare Parts
Complete list of parts and supplies.
Acceptance Tests
Test plan and procedures for the acceptance test shall explain
in detail step-by-step actions and expected results to demonstrate
compliance with the requirements specified. The procedures shall
also explain methods for simulating the necessary conditions of
operation to demonstrate system performance.
SD-06 Test Reports
Acceptance Tests
Upon completion and testing of the installed system, test
reports shall be submitted in booklet form showing all field tests
performed to adjust each component and to prove compliance with
the specified performance criteria. Each test report shall
include the final position of controls and operating mode of the
system. The manufacturer, model number, and serial number of test
equipment used in each test shall also be included.
SD-10 Operation and Maintenance Data
Intercommunication System
[Six] [_____] complete copies of operation manuals outlining the
step-by-step procedures required for system start-up, operation
and shutdown. The manuals shall include equipment layout and
schematics of simplified wiring and control diagrams of the system
as installed. Instructions shall include the manufacturer's name,
and their basic operating features.
routine maintenance procedures, possible breakdowns and repairs,
and troubleshooting guides.
Intercommunication System, Data Package 3
Submit data package in accordance with Section 01781 OPERATION
AND MAINTENANCE DATA.
1.3
SYSTEM DESCRIPTION
**************************************************************************
NOTE: This guide specification covers the
requirements for three different types of
intercommunication systems, one of which shall be
selected for the project. The various types are as
follows:
Type 1, Direct Connected, Keyed System. This type
of system is applicable for relatively small systems