percent of meter full scale is allowed for lower intensity settings before
attempting to readjust the regulator.
3.22.8
Final Operating Tests
After completion of installations and the above tests, circuits, control
equipment, and lights covered by the contract shall be demonstrated to be
in acceptable operating condition. Each switch in the control tower
lighting panels shall be operated so that each switch position is engaged
at least twice. During this process, lights and associated equipment shall
be observed to determine that each switch properly controls the
between the operator and the observer. Tests shall be repeated from the
alternate control station, from the remote control points, and again from
the local control switches on the regulators. Each lighting circuit shall
be tested by operating the lamps at maximum brightness for not less than 30
minutes. At the beginning and at the end of this test the correct number
of lights shall be observed to be burning at full brightness. [One]
[_____] day and [one] [_____] night operating test shall be conducted for
the Contracting Officer.
3.23
FINISHING
Painting required for surfaces not otherwise specified and finish painting
of items only primed at the factory shall be as required in Section 09900
PAINTS AND COATINGS.
3.24
POSTED INSTRUCTIONS
The Contractor shall submit a typed copy of the proposed posted
instructions showing wiring, control diagrams, complete layout and
methods of checking the system for normal safe operation, and procedures
for safely starting and stopping the system.
3.25
TRAINING
The Contractor shall provide training on the proper operation and
maintenance procedures for the system. The Contractor shal submit
information describing training to be provided, training aids to be used,
samples of training materials, and schedules. Training shall include a
list of special tools and test equipment required for maintenance and
testing of the products supplied by the Contractor; a list of parts and
components for the system by manufacturer's name, part number,
nomenclature, and stock level required for maintenance and repair necessary
to ensure continued operation with minimal delays; instructions necessary
to checkout, troubleshoot, repair, and replace components of the systems,
including integrated electrical and mechanical schematics and diagrams and
diagnostic techniques necessary to enable operation and troubleshooting
after acceptance of the system.
-- End of Section --
SECTION 16526A
Page 45