thoroughly checked for proper operation and all necessary adjustments shall
be made. Shunt trip coils shall be checked for proper operation.
2.9.3
Instrument Transformer Test
The voltage and current transformers shall be subjected to routine tests in
accordance with paragraph 4.7.2 of IEEE C57.13.
Five copies of typical ratio and phase angle tests shall be furnished for
each type and rating of instrument transformer.
2.9.4
Metal-enclosed Bus Test
Each shop-assembled section of metal-enclosed bus shall be subjected to a
low-frequency dielectric withstand test of 2,200 volts for 1 minute between
each conductor and the other conductors, and between all conductors
connected together and the grounded metal housing in accordance with [IEEE
C37.20.1][IEEE C37.20.2][IEEE C37.20.3].
2.9.5
Station Service Transformer Test
The station service transformers shall be subjected to the routine tests
listed in paragraph 8.3 of IEEE C57.12.01, except that the temperature
tests, if made, shall be made with the transformers in their enclosures in
order to simulate actual operating conditions.
PART 3
EXECUTION
3.1
INSTALLATION
**************************************************************************
NOTE: Add appropriate requirements to specify
installation by the Contractor.
**************************************************************************
[_____].
-- End of Section --
SECTION 16404A
Page 29