shall be tested at operating conditions to demonstrate satisfactory
functional and operating efficiency. Operating tests shall cover a period
of not less than 2 hours for each system, and all tests shall be conducted
in the presence of the Contracting Officer. If tests do not demonstrate
satisfactory operation of the exhaust system, deficiencies shall be
corrected and retested. All instruments, facilities, and labor required to
properly conduct the tests shall be provided by the Contractor. The
electricity required for testing will be furnished by the Government.
3.7
ON-SITE TRAINING
The Contractor shall conduct a training course for the operating staff as
designated by the Contracting Officer. The training period shall consist
of a total [8] [_____] hours of normal working time and shall start after
the system is functionally completed but prior to final acceptance tests.
The field instructions shall cover all of the items contained in the
routine maintenance operations. The Contracting Officer shall be notified
at least 14 days prior to date of proposed conduction of the training
course.
-- End of Section --
SECTION 15940A
Page 18