3.3.2
Finish Painting
**************************************************************************
NOTE: Designer will coordinate color code marking
with Section 09900.
**************************************************************************
The requirements for finish painting of items only primed at the factory,
and surfaces not specifically noted otherwise, are specified in Section
09900 PAINTS AND COATINGS.
3.3.3
Color Coding Scheme for Locating Hidden Utility Components
**************************************************************************
NOTE: Coordinate the Color Code Table with the
installation. Delete identification plate specified
scheme is specified.
**************************************************************************
Use scheme in buildings having suspended grid ceilings. The color coding
scheme shall identify points of access for maintenance and operation of
components and equipment that are not visible from the finished space and
are accessible from the ceiling grid. The color coding scheme shall
consist of a color code board and colored metal disks. Each colored metal
disk shall be approximately 13 mm 3/8 inch diameter and secured to
removable ceiling panels with fasteners. Insert each fastener into the
ceiling panel so as to be concealed from view. The fasteners shall be
manually removable without the use of tools and shall not separate from the
ceiling panels when the panels are dropped from ceiling height.
Installation of colored metal disks shall follow completion of the finished
surface on which the disks are to be fastened. The color code board shall
be approximately 1 m 3 foot wide, 750 mm 30 inches high, and 13 mm 1/2
inches thick. The board shall be made of wood fiberboard and framed under
glass or 1.6 mm 1/16 inch transparent plastic cover. The color code
symbols shall be approximately 19 mm 3/4 inch in diameter and the related
lettering in 13 mm 1/2 inch high capital letters. Mount the color code
board [where indicated] [in the mechanical or equipment room]. The color
code system shall be as indicated below:
Color
System
Item
Location
[_____]
[_____]
[_____]
[_____]
3.4
DUCTWORK LEAK TEST
**************************************************************************
NOTE: Omit this paragraph for Navy projects.
Delete the bracketed portion of "Test Procedures"
in SD-03, and "Performance Tests" in SD-06 of this
Section.
This paragraph may be omitted where all ductwork is
constructed to static pressure Class 125, 250, or
500 Pa (1/2, 1, or 2 inch W.G.). Delete the
corresponding requirements in SD-06 of this Section
and corresponding paragraph in Section 15990 when
this paragraph is deleted.
SECTION 15895
Page 61