percent zinc in the dry film. Apply primer in accordance with
manufacturer's recommendations. Apply primer to steel surfaces except the
areas within 50 mm two inches adjacent to field welds and surfaces
specified to be hot-dip galvanized.
PART 3
EXECUTION
3.1
FACTORY INSPECTION
Any material or equipment used in the manufacture of the precipitator and
found to be defective during inspection at the manufacturer's plant shall
be either corrected or replaced as approved by the Contracting Officer
before shipment. Acceptance at the factory shall not constitute final
acceptance.
3.2
INSTALLATION
**************************************************************************
NOTE: Revise this paragraph as necessary when it is
desired to have the precipitator manufacturer
install the equipment furnished.
**************************************************************************
The contractor shall install the equipment specified herein on foundations
or structural-steel framework shown on the drawings or as specified
elsewhere herein. Installation shall be in accordance with the
manufacturer's recommendations.
3.3
MANUFACTURER'S FIELD REPRESENTATIVE
**************************************************************************
NOTE: The period of instruction should be reduced
only if the operating personnel have significant
experience on identical equipment.
**************************************************************************
The contractor shall provide the services of a field representative(s)
specifically trained by the manufacturer to assist installers of their
equipment. The field representative(s) shall be at the erection site
during installation including unloading, hauling, storing, cleaning,
erecting, and testing. The field representative(s) shall supervise the
adjustment of all controls, control devices, and components supplied with
the precipitator as necessary to place the precipitator in successful
operation. The field representative(s) shall instruct the plant operators
in the operation, care, and maintenance of the equipment. Provide a
minimum of 10 working days advance notice to the Contracting Officer prior
to scheduling these instructions. Provide a total of [20] [_____] days
instruction including [6] [_____] round trips to the jobsite. Provide
training by field representative in precipitator theory and design,
evaluation, problem diagnosis, maintenance, inspection methods, safety,
operations and maintenance plans.
3.4
FIELD TESTS AND INSPECTIONS
3.4.1
Delivery Inspection
Materials and equipment shall be inspected in accordance with the Contract
Clauses. Inspections may be made to assure that equipment and installation