Installation
Drawings shall consist of a complete list of equipment and
material including manufacturer's descriptive and technical
details required to demonstrate that the system has been
coordinated and will properly function as a unit. Drawings shall
show proposed layout and anchorage of equipment and appurtenance
and equipment relationship to other parts of the work including
clearances required for maintenance and operation.
SD-03 Product Data
Spare Parts
Spare parts data for each different item of material and
equipment specified.
Tests
Proposed test procedures for ductwork leak and performance
tests, at least 2 weeks prior to the start of related testing.
System Diagrams[; G][; G, [_____]]
Proposed diagrams, at least 2 weeks prior to start of related
testing. System diagrams that show the layout of equipment and
ductwork, and typed condensed operation manuals explaining
preventative maintenance procedures, methods of checking the
system for normal safe operation, and procedures for safely
starting and stopping the system shall be framed under glass or
laminated plastic. After approval, these items shall be posted
where directed.
Qualifications
Statement of qualifications, as specified.
Field Training
Proposed schedule for field training, at least 2 weeks prior to
SD-06 Test Reports
Tests
Test reports for the ductwork leak test and the performance
tests in booklet form, upon completion of testing. Reports shall
document phases of tests performed including initial test summary,
repairs/adjustments made, and final test results.
SD-10 Operation and Maintenance Data
Operating and Maintenance Instructions
[Six] [_____] manuals listing step-by-step procedures required
for system startup, operation, shutdown and routine maintenance,