Conduct a preliminary operational test prior to requesting an acceptance
operational test and inspection by a [_____] Division, Naval Facilities
Engineering Command Boiler inspector. The Contracting Officer, upon
receipt of the notice from the Contractor, shall request the boiler be
inspected by [_____] Division Naval Facilities Engineering Command.
Fifteen days advance notice is required for scheduling the inspector to
conduct acceptance operational test and inspection.
3.6
SCHEDULE
Some metric measurements in this section are based on mathematical
conversion of inch-pound measurements, and not on metric measurements
commonly agreed on by the manufacturers or other parties. The inch-pound
and metric measurements shown are as follows:
Products
Inch-Pound
Metric
a.
Pressure Gage
Diameter
= 6 inches
= 150 mm
b.
Stack Thermometer
Scale Range
= 150-750 degrees F
= 66-399 degrees C
c.
Alarm Bell
Diameter
= 4 inches
= 100 mm
-- End of Section --
SECTION 15515N
Page 15