to extend completely through floors, roofs, and walls, so that sleeve ends
are flush with finished surfaces except that ends of sleeves for floor
slabs shall extend 13 mm 1/2 inch above finished floor surface. Sleeves
located in waterproofed construction shall include flange and clamping ring.
2.10.14.2
Partitions
Galvanized sheet steel, 26 gage or heavier, of sufficient length to
completely extend through partition thickness with sleeve ends flush with
partition finished surface.
2.10.15
Piping Identification
Conform to MIL-STD-101 and place in clearly visible locations; except that
piping in the boiler room shall be painted the primary color of the color
code. Labels and tapes conforming to ANSI A13.1 shall be used in lieu of
band painting or stenciling. Labels shall be outdoor grade acrylic
plastic. Markings on the labels shall indicate the direction of flow,
flowing media, and media design pressure and temperature. Spacing of
identification marking shall not exceed 3 meters 10 feet. Provide two
copies of the complete color and stencil codes used. Frame codes under
glass and install where directed.
2.11
FIRE PROTECTION SYSTEM
Provide the fuel oil [and gas metering] room[s] with a wet sprinkler system
as specified in Section 13930N WET PIPE FIRE SUPPRESSION SPRINKLERS.
2.12
MARKING
indicating elements by printed, stamped or manufactured identification
plates or tags of rigid plastic or non-ferrous material. Lettering for
identification plates or tags shall be not less than 5 mm 3/16 inchhigh.
or tags to equipment or devices without impairing functions or, when this
is not possible, attach using a non-ferrous wire or chain. In addition to
the identification plate or tag, each major component of equipment shall
have a nameplate listing the manufacturer's name, model number, and when
standards or codes.
2.13
TOOLS AND TESTING EQUIPMENT
Provide special tools and wrenches required for the installation,
maintenance, and operation of the equipment. Provide testing equipment
necessary to perform routine tests:
a.
(saybolt test), and dirt (gravimetric).
b.
On softened water for hardness (soap test or colorimetric test),
and boiler blowdown water for pH (colorimetric) and conductivity
(potentiometer).
c.
For water (distillation) and sediment (gravimetric) in fuel oil.
SECTION 15511N
Page 76