contacts, and voltages shall be as indicated on the control diagrams.
2.9.18.7
Presence Indicators and Response Switches
Provide at hoppers and conveyor discharges located and protected according
to manufacturer's recommendations to ensure safe and reliable operation.
Mount presence indicators in such a manner that they will not be injured by
occasional large lumps nor falsely operated by stray lumps or collected
amounts of coal.
2.9.19
Control Panel and Controls
Provide a semi-automatic control system for the coal handling system as
indicated. Control panel NEMA 12 construction, centrally located in the
main plant control room. Panel front shall include a system graphic
display as indicated. Display shall be approximately to scale and painted
with an industrial acrylic enamel. Outline items with 3 mm 1/8 inch wide
black lines. Lettering shall be on engraved plastic screwed to the front
of the panel, with white letters on a black background. Provide controls
for operation on [_____] volt, [_____] phase, 60 Hz a.c. Panel shall be
complete with an annunciator and interlocks, relays, switches, running and
safety lights, and auxiliary parts necessary to safely control and operate
the system. Items located in the door shall be dust-tight and oil tight
with push-to-test indicating lights being of the transformer type. Control
relays shall be 10 amp, 600 volt class with convertible contacts. Provide
and mark terminals for connections with the exception of the neutral.
Panel shall contain [_____] percent spare terminals. Wiring shall be No.
14 AWG type THHN stranded. Neutral wire shall be white and other wiring of
120 volts or less shall be color coded and labeled.
Provide a plastic
wire duct of sufficient size to provide [_____] percent cross sectional
spare. Wiring shall be in accordance with requirements of NFPA 70.
2.9.19.1
Panel Devices
Control panel shall include the following indicating lights (color in
parenthesis):
a.
Power - ON
(red)
b. System Run (3 required)
Rail unloading hopper to storage yard
(green)
Reclaim hopper to boiler plant
(green)
Bunker to boiler plant
(green)
c.
Rail unloading hopper surfactant sprays - ON
(green)
d.
Reclaim hopper surfactant sprays - ON
(green)
e.
Stackout tube belt conveyor -
ON
(green)
f.
Reclaim belt feeder - ON
(green)
g.
Bunker rotary vane feeder - ON
(green)
h.
Bunker reclaim belt feeder - ON
(green)
i.
Bucket elevator - ON
(green)
j.
Bunker - HIGH LEVEL
(green)
SECTION 15502N
Page 116