height, and 12 mm 1/2 inch thickness. The board shall be made of wood
fiberboard and framed under glass or 1.6 mm 1/16 inch transparent plastic
cover. Unless otherwise directed, the color code symbols shall be
approximately 20 mm 3/4 inch in diameter and the related lettering in 13 mm
1/2 inch high capital letters. The color code board shall be mounted and
located in the mechanical or equipment room. The color code system shall
be as indicated below:
Color
System
Item
Location
[_____]
[_____]
[_____]
[_____]
3.20
ESCUTCHEONS
Escutcheons shall be provided to finished surfaces where bare or insulated
piping exposed to view passes through floors, walls, or ceilings, except in
boiler, utility, or equipment rooms. Escutcheons shall be fastened
securely to pipe or pipe covering and shall be satin finish,
corrosion-resisting steel, polished chromium-plated zinc alloy, or polished
chromium-plated copper alloy. Escutcheons shall be either one piece or
split-pattern, held in place by internal spring tension or setscrew.
3.21
PAINTING
Painting of pipes, hangers, supports, and other iron work, in concealed
spaces or exposed, is specified in Section 09900 PAINTS AND COATINGS.
3.22
TESTS, FLUSHING AND DISINFECTION
**************************************************************************
NOTE: Some facilities may require a
conditioning/flushing of water fountains and faucets
that are listed as end point devices by NSF 61,
Section 9. This is to meet possible customer
expectations that these devices produce drinking
water that meets the lead leaching requirements of
NSF 61 immediately upon beneficial occupancy. If
the customer is not willing to allow the end point
devices to "self-condition" after project turn-over,
then the designer should edit the paragraph titled
System Flushing, requiring the Contractor to flush
**************************************************************************
3.22.1
Plumbing System
The following tests shall be performed on the plumbing system in accordance
with ICC IPC, except that the drainage and vent systemfinal test shall
include the smoke test. The Contractor has the option to perform a
peppermint test in lieu of the smoke test. If a peppermint test is chosen,
the Contractor must submit a testing procedure to the Contracting Officer
for approval.
a.
b.
Building Sewers Tests.
c.
Water Supply Systems Tests.
SECTION 15405A