and to test dispensing nozzle's capability to recirculate vapors from
receiving unit back to storage tank. When a portion of each system or a
piece of equipment fails to pass tests, make repairs or adjustments and
repeat test until satisfactory performance is achieved. Tests shall be
witnessed by the Contracting Officer, and the Contractor shall notify the
Contracting Officer [_____] days before testing. Furnish calibrated
instruments and equipment, as well as the fuel, required to clean and flush
each system and to conduct tests. Upon completion of tests replace filters.
3.8
LEAK DETECTION MONITORING SYSTEM TEST
Activate leak monitoring system and test in accordance with manufacturer's
instructions.
3.9
SCHEDULE
Some metric measurements in this section are based on mathematical
conversion of inch-pound measurement, and not on metric measurement
commonly agreed to by the manufacturers or other parties. The inch-pound
and metric measurements shown are as follows:
Products
Inch-Pound
Metric
a.
Dispensing Unit
Flow Rate
= 12 gpm
= 0.76 liters/sec
b.
Flange Gaskets
Thickness
= 1/16 inch
= 1.60 mm
c.
Buried Warning and
Identification Tape
Width
= 3 inches
= 80 mm
-- End of Section --