Submit test reports in accordance with the paragraph entitled
"Field Quality Control."
SD-07 Certificates
Backflow preventer certification
Report of prior installations
Welding procedures
Welder's qualifications
SD-10 Operation and Maintenance Data
Convectors, Data Package 3; G
Finned tube radiators, Data Package 3; G
Submit in accordance with Section 01781 OPERATION AND
MAINTENANCE DATA. Submit a list of qualified service
organizations which includes addresses and qualifications.
1.5
QUALITY ASSURANCE
1.5.1
Standard Commercial Product for Terminal Units
Terminal units provided shall comply with features called out in this
specification and shall be the manufacturer's standard commercial product.
Additional or better features which are not prohibited by this
specification but which are a part of the manufacturer's standard
commercial product, shall be included in the terminal units being
furnished. A standard commercial product is a product which has been sold
or is currently being offered for sale, on the commercial market through
advertisements or manufacturer's catalogs, or brochures. Provide Institute
of Boiler and Radiator Manufacturer (IBR) or Steel Boiler Institute (SBI)
rating for required capacity.
1.5.2
Welding
1.5.2.1
Report of Prior Installations
Submit a Certificate of Full Approval or a current Certificate of Approval
for each design, size, and make of backflow preventer being provided for
the project. Certificate shall be from the Foundation for Cross-Connection
Control and Hydraulic Research, University of Southern California, and
shall attest that this design, size, and make of backflow preventer has
evaluation for the respective level of approval. A Certificate of
Provisional Approval is not acceptable in lieu of the above.
1.5.2.2
Welding Procedures
Before performing welding, submit three copies of welding procedure
specification for all metals to be used in the work, together with proof of
welder's qualification as outlines in ASME B31.9.
SECTION 15185N
Page 11