At no time shall more than 85 g (3 ounces) 3 ounces of refrigerant be
released to the atmosphere in any one occurrence. Any system leaks within
the first year shall be repaired in accordance with the requirements herein
at no cost to the Government including material, labor, and refrigerant if
the leak is the result of defective equipment, material, or installation.
3.4
DEMONSTRATIONS
Contractor shall conduct a training course for [_____] members of the
operating staff as designated by the Contracting Officer. The training
period shall consist of a total [_____] hours of normal working time and
start after the system is functionally completed but prior to final
acceptance tests. The field posted instructions shall cover all of the
as demonstrations of routine maintenance operations.
-- End of Section --
SECTION 15182
Page 29