d. Description of test procedure used, including dates, test
personnel, any retest events, and witness test data.
e.
List of all test instruments with model numbers and serial numbers.
f.
g.
A discussion of test results.
h.
Conclusions.
i. Photographic evidence in the form of either 24 color photographs of
test equipment, test setup and representative test segments, or a VHS
videotape, at least 30 minutes in length, covering the same information
as photographs. All photographic evidence should be labeled with
contract number, location, date/time, and test activity. Videotape
shall be voice annotated with the same information.
j.
k.
Copies of all recorded test data.
l.
Curves required by the paragraph TESTS RESULTS.
m.
Curves showing the performance of the prototype pump.
n. Drawings of the test set-up showing all pertinent dimensions,
elevations and cross section of the pump.
PART 3
EXECUTION
3.1
INSTALLATION
Correct installation and assembly of the pumping unit shall be the
Contractor's responsibility and shall be in accordance with the drawings
and with the manufacturer's installation instruction manual. The
Contractor shall furnish all bolts, shims, tools, and other devices
necessary for installing the pumping units. The manufacturer's
representative(s) familiar with the equipment being installed shall
supervise the handling, installation, start-up, and testing of the
equipment as required in the paragraph INSTALLATION AND START-UP ENGINEER.
3.2
CLEANUP PRIOR TO START
After the pumping unit is installed and prior to start-up, complete clean
up of the sump area of any accumulated construction debris shall be done.
This final cleaning of the sump area will be witnessed by a representative
of the Government. Any damage to the pumping units or related equipment
during initial start-up due to foreign objects left in the sump areas shall
be corrected at the Contractor's expense.
3.3
PUMP FIELD TESTS
**************************************************************************
NOTES: Compliance with specification performance has
field tests are for the purpose of baseline
measurements. Pump integrity, vibration,
manufacture, and inspection are witnessed at the
SECTION 15132A