Pendant pushbutton station; G
Electrification; G
SD-05 Design Data
Load and sizing calculations; G
SD-06 Test Reports
Wire rope breaking strength test; G
Load chain proof test; G
Hook and hook nut magnetic particle inspection; G
Post-erection inspection; G
Hook test; G
No-load test; G
Load test; G
Rated load speed test; G
SD-07 Certificates
Bolts; G
Nuts; G
Washers; G
Painting system; G
SD-10 Operation and Maintenance Data
Overhead monorail system, Data Package 3; G
Submit in accordance with Section 01781 OPERATION AND
MAINTENANCE DATA.
1.4
DELIVERY, STORAGE, AND HANDLING
1.4.1
Delivery and Storage
Inspect materials delivered to site for damage; unload and store with
minimum handling. Store materials on-site in enclosures or under
to prevent damage during periods of inclement weather, including
subfreezing temperatures, precipitation, and high winds. Store materials
susceptible to deterioration by direct sunlight under cover and avoid
damage due to high temperatures. Do not store materials directly on
ground. When special precautions are required, prominently and legibly
SECTION 14622N
Page 7