instructions for approval prior to installation. Instructions shall be in
engraved white letters on red rigid plastic or red enameled steel
backgrounds and shall be of adequate size to permit them to be easily read.
3.10
TRAINING REQUIREMENTS
Prior to final acceptance, the Contractor shall provide two sessions of 4
hours each of operation and maintenance training to the Base Fire
Department and [Public Works] [Civil Engineering] personnel on two
different days to accommodate both shifts of the Base Fire Department. Each
training session shall include emergency procedures, and unique maintenance
and safety requirements. Training areas will be provided by the Government
in the same building as the protected areas. The training conducted shall
period shall be coordinated through the Contracting Officer not less than
two weeks prior to the session.
3.11
SCHEDULE
Some metric measurements in this section are based on mathematical
conversion of inch-pound measurements, and not on metric measurements
commonly agreed on by the manufacturers or other parties. The inch-pound
and metric measurements shown are as follows:
Products
Inch-Pound
Metric
a.
Alarm Bells
Diameter
= 4 inches
= 100 mm
b.
Tank Capacity
= 10 gallons
= 38 liters
c.
Concentrate Fill Pump
Minimum Flow Rate
= 7 gpm
= 26.4 L/m
d.
Diaphragm Pressure
Proportioning Tanks
Working Presure
= 115 psig
= 793 kPa (gage)
e.
Buried Warning and
Identification Tapes
Minimum Width
= 3 inches
= 80 mm
-- End of Section --