1.3
RELATED REQUIREMENTS
Section 15050N BASIC MECHANICAL MATERIALS AND METHODS, applies to this
section, with the additions and modifications specified herein.
1.4
SYSTEM DESCRIPTION
1.4.1
**************************************************************************
NOTE: Identify the tanks which are to be protected
by each system.
**************************************************************************
**************************************************************************
NOTE: Include only those NFPA codes applicable to
the specific project.
**************************************************************************
Design and [provide a new] [and] [modify an existing] aqueous film forming
foam (AFFF) fuel tank protection system for [_____]. System shall provide
uniform distribution of AFFF solution to provide complete coverage by
surface application to the tank(s) indicated. The design, equipment,
materials, installation, and workmanship shall be in strict accordance with
the required and advisory provisions of NFPA 11, NFPA 13, [NFPA 14,] NFPA 16,
[NFPA 24,] [NFPA 30,] NFPA 70, and NFPA 72, except as modified herein.
[Each] [The] system [shall be designed for earthquakes and] shall include
all materials, accessories and equipment necessary to provide [each] [the]
system complete and ready for use. Design and install [each] [the] system
to give full consideration to blind spaces, piping, electrical equipment,
and all other construction and equipment to provide complete coverage in
accordance with the drawings to be submitted for approval. Devices and
equipment for fire protection service shall be of a make and type listed by
the Underwriter's Laboratories Inc. in the UL Fire Prot Dir, or approved by
the Factory Mutual System and listed in FM P7825. In the publications
referred to herein, the advisory provisions shall be considered to be
mandatory, as though the word "shall" had been substituted for "should"
wherever it appears; reference to the "authority having jurisdiction" shall
be interpreted to mean the [[_____] Division, Naval Facilities Engineering
Command Fire Protection Engineer] [Corps of Engineers Contracting Officer].
Begin work at the point indicated.
1.4.1.1
Shop Drawings
Prepare shop drawings for the fire extinguishing system in accordance with
the requirements for "Plans" as specified in NFPA 11 and "Working Plans" as
specified in NFPA 13. Each drawing shall be A1 841 x 594 mm 34 by 22 inches.
Do not commence work until the design of [each] [the] system and the
various components have been approved. Show:
a.
Tank and tank farm area layout and include data essential to the
proper installation of [each] [the] system.
b.
Foam chambers, discharge nozzles and system piping layout
annotated with reference points for design calculations.
c.
connection and terminals used for all electrical field connections
in the system, with wiring color code scheme.