complete functional and operational performance test by the Contractor.
Test shall determine that the system is free from grounded, shorted, or
open circuits. When all corrections have been made, the system shall be
retested to assure that it is functional. Copies of performance test
reports shall be submitted in accordance with paragraph SUBMITTALS.
3.4.2
Acceptance Test
**************************************************************************
NOTE: Listed tests are minimum required. If
additional tests are required such tests must be
added to the list.
**************************************************************************
Testing shall be in accordance with NFPA 72. The recommended tests in NFPA
72 shall be considered mandatory and shall verify that all previous
deficiencies have been corrected. The tests shall include the following:
a.
Tests to indicate there are no grounded, shorted, or open circuits.
b.
Tests of each input to each digital alarm communicator
transmitter, including transmission of trouble and alarm signals
across both the first and second telephone lines at each location
and proper reception at the monitoring center.
c.
Tests of DACR, terminal and printer for all required functions.
d.
Tests shall include verification of complete system operation at
extreme end of the required emergency power duration, and
verification of recharging time.
3.5
TRAINING
Training course shall be provided for the operations and maintenance staff.
The course shall be conducted in the building where the monitoring center
is installed or as designated by the Contracting Officer. The training
period shall consist of [3] [_____] training days (8 hours per day) and
shall start after the system is functionally completed but prior to final
acceptance tests. Training shall be provided for [_____] personnel. The
instructions shall cover all of the items contained in the operating and
maintenance instructions.
-- End of Section --