3.1.5
Repairs
Wherever walls, ceilings, or floors are cut for installation, repair,
restore and finish to original appearance.
3.1.6
Signal Stations
The wall mounted duress station shall be mounted 1370 mm 54 inchesabove the
finished floor with 6.35 mm - 20 - 25 mm 1/4 inch - 20 - 1 inch long tamper
proof screw. The system shall be completely checked out and tested before
installation of the fasteners.
3.1.7
Floor Station
Floor mounted duress station shall be attached to millwork on floor. When
mounted under millwork, wiring shall be routed in millwork to conduit
system via flexible conduit.
3.2
FIELD QUALITY CONTROL
Conduct testing specified herein in the presence of the Contracting Officer.
3.2.1
Duress System Test
An operational system test shall be performed to verify conformance of the
duress system to this specification. The Contractor shall notify the
Contracting Officer two weeks prior to when tests are to be performed so
that tests may be witnessed by Contracting Officer. These tests shall
include alarms from stations to panels.
3.2.2
Retesting
Rectify deficiencies indicated by tests and completely retest work affected
by such deficiencies.
3.2.3
Inspection
Make observations to verify that units and controls are properly labeled,
and interconnecting wire and terminals identified. Contracting Officer
will observe system features specified.
3.3
TRAINING OPERATING AND MAINTENANCE PERSONNEL
3.3.1
Instructing Government Personnel
Upon completion of the work and at a time designated by the Contracting
Officer, furnish a competent technician regularly employed or authorized by
the manufacturer of the duress system to instruct Government personnel in
the proper operation, maintenance, safety, and emergency procedures of the
duress system. The period of instruction shall be four eight-hour working
days. Conduct training at the job site.
-- End of Section --