repair, and repeat the test.
3.2.2.2
Operation Tests
**************************************************************************
NOTE: Insert appropriate Section number and title
in blank below using format per UFC 1-300-02.
**************************************************************************
valves, and other components in accordance with manufacturer's written
recommendations. Test entire system in accordance with [Section 15950N
HVAC TESTING/ADJUSTING/BALANCING][_____].
3.2.3
Manufacturer's Field Services
Furnish the services of a technical representative of the collector
manufacturer, at the job site during each phase of inspection,
installation, and testing. For solar collectors, furnish the services of a
manufacturer's representative to instruct Government personnel for one
manday, in the operating and maintenance of equipment. Notify the
Contracting Officer in writing, prior to scheduling instructions.
-- End of Section --