Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for [Contractor Quality Control
approval.] [information only. When used, a designation following the "G"
designation identifies the office that will review the submittal for the
Government.] The following shall be submitted in accordance with Section
01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Detail Drawings
Detail drawings, as specified.
SD-07 Certificates
Materials
Where material or equipment is specified to comply with
requirements of UL, proof of such compliance. The label of or
listing in UL Elec Const Dir will be acceptable evidence. In lieu
of the label or listing, a written certificate from an approved
nationally recognized testing organization equipped to perform
such services, stating that the items have been tested and conform
to the requirements and testing methods of Underwriters
Laboratories may be submitted. A letter of findings shall be
provided on the following facilities: [_____].
1.3
GENERAL REQUIREMENTS
1.3.1
Verification of Dimensions
The Contractor shall become familiar with all details of the work, verify
all dimensions in the field, and shall advise the Contracting Officer of
any discrepancy before performing the work. No departures shall be made
without the prior approval of the Contracting Officer.
1.3.2
Standard Products
The system furnished under this specification shall consist of the standard
products of a manufacturer regularly engaged in the production of lightning
protection systems and shall be the manufacturer's latest UL approved
780, UL 96 and UL 96A, except where requirements in excess thereof are
specified herein.
1.3.3
Detail Drawings
The Contractor shall submit detail drawings consisting of a complete list
of material, including manufacturer's descriptive and technical literature,
shall demonstrate that the system has been coordinated and will function as
a unit. Drawings shall show proposed layout and mounting and relationship
to other parts of the work.
SECTION 13100A