installed position.
The SA shall be not less than 50 percent of minimum
required.
3.5.2.2
SA Due to Inner or Outer or Both EM Coils
Perform this test by energizing one at a time inner, outer, and both EM
coils to determine the SA provided by inner, outer , and both EM coils.
Perform this test in the field in the installed position. The SA for each
test point, due to inner or outer coil, shall be not less than 80 percent
of minimum required.
3.6
TRAINING
Provide a minimum of [8] [_____] hours of hands on maintenance training to
each person designated by the Contracting Officer. Training shall include
cleaning of knife edge, finger-stock, alignment of doors, adjustment of
latching mechanism, replacement of gaskets and finger-stocks, lubrication,
interlock, locking (latching) mechanism, and adjustment of hinges. Provide
[6] [_____] [VHS] [_____] video cassette tapes which shall show details and
procedures of hardness critical item HEMP shielded door in accordance with
HM/HS manual.
3.7
SITE SPECIFIC REPAIRS AND TEMPORARY FIXES
Corrections and repairs are allowed, however, modification is prohibited.
Use of bronze wool, conductive tape, conductive calking, pieces of RF
gaskets all shapes and sizes, rope gasket, and microwave absorber, which
are normal troubleshooting aids are prohibited as permanent solution (fix)
to correct design or manufacturing deficiencies of HEMP shielded door.
Only the use of materials such as RF gasket, finger-stock shown in approved
shop drawings, catalog, HM/HS manual, and list of material shall be
acceptable. Each HEMP shielded door of similar design shall contain
identical RF gasket material.
3.8
RETESTS
Retest each repair, adjustment, corrective action including cleaning or
HEMP shielded door at each frequency for each test point. If retest is
scheduled for a later date, Contractor shall provide [30] [_____] days
notice for Continental United States and [45] [_____] days notice for
overseas locations for Government to witness the retests. Recalibrate if
the dynamic range varies more than 3 dB compared to the beginning of the
calibration of each day. Retest each test points. Recalibrate if any
hardware is changed.
3.9
EMERGENCY EXIT PANIC HARDWARE FIELD MODIFICATION
Equip emergency exit with panic hardware. Force required to release
(unlatch) emergency exit HEMP shielded door shall meet NFPA 101.
Modifications or alterations to panic hardware and latching mechanism in
the field is prohibited in order to meet NFPA 101.
3.10
WELDING
AWS D1.1/D1.1M, certified welders. When specimens are removed from part of
an assembly, repair cut members at no additional cost to Government, with
joints of proper type to maintain SA and to develop full strength of
members and joints cut, with peelings as necessary or directed to relieve
SECTION 13095N