the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
diagrams and any other details required to demonstrate that
cabinets and sterilizer systems have been coordinated and will
function as a unit. Drawings shall show proposed layouts and
anchorage of equipment and appurtenances, and equipment
relationship to other work including clearances for maintenance
and operation. Drawings shall include installation details and
settings, drain piping connections, and complete electrical wiring
and control diagrams.
SD-03 Product Data
ASME Form U-1
A signed copy of ASME Form U-1 or U-1A, as shown in ASME BPVC
SEC VIII D1 Appendix W, with each sterilizer, as applicable.
Equipment
Materials
A complete list of equipment and material, including
manufacturer's descriptive data and technical literature,
performance charts and curves, catalog cuts, and installation
instructions.
Spare Parts
Spare parts data for each different item of equipment and
material specified.
SD-06 Test Reports
Field Tests and Inspections
tested. Test reports in booklet form showing field tests
performed to adjust each component and all field tests performed
to prove compliance with the specified performance criteria, upon
report shall indicate the final position of controls.
SD-10 Operation and Maintenance Data
Operations and Maintenance Instructions[; G][; G, [_____]]
Training[; G][; G, [_____]]
[Six] [_____] complete copies of operation manual outlining the
step-by-step procedures required for system startup, operation,
and shutdown. The manuals shall include the manufacturer's name,
model number, service manual, parts list, and brief description of
all equipment and their basic operating features. [Six] [_____]
SECTION 11710
Page 8