accordance with QC procedures of Section 01450N DESIGN AND CONSTRUCTION
QUALITY CONTROL. Submit report within 24 hours of date recorded on the
report.
3.10.2.3
Inspection Logbook
A continuous record of all activity related to this Section shall be
maintained in an Inspection Logbook on a daily basis. The logbook shall be
hard or spiral bound with consecutively numbered pages, and shall be used
to record all information provided in the Daily Inspection Reports, as well
as other pertinent observations and information. The Coating Inspector's
Logbook that is sold by NACE is satisfactory. Submit the original
Inspection Logbook to the Contracting Officer upon completion of the
project and prior to final payment. The contracting Officer will forward
the Logbook to LANTNAVFACENGCOM Code 1613G, to be reviewed and filed for
warranty information.
3.10.3
Inspection Equipment
All equipment shall be in good condition, operational within its design
range, and calibrated as required by the specified standard for use of each
device.
3.10.3.1
Black Light
Use a black light having a 365 nanometer intensity of 4,000 microwatts per
square centimeter minimum at 380 mm 15 inches. The Spectroline BIB-150P
from Spectronics Corporation satisfies this requirement.
3.10.4
Hold Points for Quality Control Inspections
Provide appropriate QC inspections at the following hold-points:
Step
Action
Prior to preparation of
Safety inspection
tank(s) for cleaning
and repair
After cleaning of tank(s)
1. Safety inspection, removal of dirt, trash,
and prior to abrasive
blasting
2. Surface inspection for oil, grease, soluble
Initiation of abrasive
blasting, and at each
work stoppage
holding the blast.
2. Confirm surfacing requirements of Section
13209 WATER STORAGE STEEL TANKS have been
satisfied.
3. Surface inspection to insure all aspects
of surface preparation are properly addressed,
as specified in article entitled "Surface
Preparation."
SECTION 09972
Page 31