THE SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC AB 1
(1991; R 2000) Mineral and Slag Abrasives
SSPC AB 2
(1996; R 2000) Cleanliness of Recycled
Ferrous Metallic Abrasive
SSPC AB 3
(2003) Newly Manufactured or
Re-Manufactured Steel Abrasives
SSPC SP 5
(2000) White Metal Blast Cleaning
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1
(2003) Safety -- Safety and Health
Requirements
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910
Occupational Safety and Health Standards
29 CFR 1926
Safety and Health Regulations for
Construction
42 CFR 84
1.2
LUMP SUM PRICE
**************************************************************************
NOTE: If Section 01270A MEASUREMENT AND PAYMENT is
paragraph title (LUMP SUM PRICE) should be deleted
from this section and the remaining appropriately
edited subparagraphs below should be inserted into
Section 01270a.
**************************************************************************
1.2.1
Payment
Payment shall constitute full compensation for furnishing all plant, labor,
materials and equipment and performing all operations necessary for
metallizing hydraulic structures as specified.
1.2.2
Unit of Measure
Unit of measure:
Lump Sum
1.3
NOMENCLATURES
a.
Metallizing: The term "metallizing" as used herein refers to any
of several application methods for depositing sprayed-metal
coatings.
b.
Wire Flame-Spray: The term "wire flame-spray" refers to a
metallizing process in which metallic wire is melted in an oxygen
and fuel gas flame and is dispersed with an airstream.
c.
Arc-Spray: The term "arc-spray" refers to a metallizing process
in which metallic wire is melted by an electric arc and is
SECTION 09971A
Page 6