work stoppage
holding the blast.
2. Confirm surfacing requirements of [Section
13205 and ]the Article entitled "Use of Door
Sheet Access Way" have been satisfied.
3. Surface inspection to insure all aspects
of surface preparation are properly addressed,
as specified in article entitled "Surface
Preparation."
Surface inspection to insure all aspects
of surface preparation are properly addressed,
as specified in article entitled "Surface
Preparation."
Immediately prior to
coating application -
provide for each coating
the blast as specified in article entitled
application evolution
2. Surface inspection to insure all aspects
of surface preparation are properly addressed,
as specified in article entitled "Surface
Preparation."
3. Confirm that testing equipment for
monitoring of hazardous conditions during
coating application are working properly and
are prepared for use as outlined in
contractor's Confined Space Entry Plan.
During and after coating
Coating application inspection as specified in
application.
paragraphs entitled "Application of Coating
System" and "Field Tests and Inspection".
After final cleanup
Clean-up inspection specified in the article
entitled "Final Cleanup."
3.12
FINAL CLEANUP
Following completion of the work, remove debris, equipment, and materials
from the site. Remove temporary connections to Government or Contractor
furnished water and electrical services. Restore existing facilities in
and around the work areas to their original condition.
SECTION 09970