3.2
TESTS
After installation is completed, each door shall be field tested for
operation, clearance, fit, and seating by operating the door and hardware
through at least 10 operating cycles. Door and hardware operation shall be
tested using the forces specified. Personnel and equipment required to
perform field testing shall be provided by the Contractor. Unless waived,
all field tests shall be performed in the presence of the Contracting
Officer. After testing is completed, test reports shall be prepared and
[three] [_____] copies furnished.
3.3
MANUFACTURER'S FIELD SERVICE
Installation and testing of door assemblies shall be under the supervision
of the door manufacturer's erection engineer. Upon completion of the work,
and at a time designated by the Contracting Officer, the services of one
engineer and other technical personnel as required shall be provided for a
period of not less than [4] [_____] hours to instruct Government personnel
in the operation and maintenance of the blast doors and all other items
furnished under this specification section. The instructions shall also
include use of the operation and maintenance manual. The instructions
shall include videotapes. An instruction outline and procedure shall be
submitted and approved prior to scheduling the instruction. One copy of
all instruction material shall be provided at the time of instruction.
-- End of Section --