PAINTS AND COATINGS.
3.3
FIELD QUALITY CONTROL
3.3.1
Manufacturer's Field Services
Provide an authorized representative of the door manufacturer to supervise
erection of doors.
3.3.2
Tests
Immediately after the door installation is complete, the door manufacturer
or his representative shall perform a complete operating test in the
presence of the Contracting Officer. Correct defects disclosed by the
test. Retest the doors and adjust them until the entire installation is
fully operational and acceptable to the Contracting Officer.
-- End of Section --
SECTION 08342
Page 22