area shall be representative of typical installation of
fireproofing including metal decks, beams, columns and
attachments. Equipment, materials and procedures used in the
sample area shall be the same as, or representative of, that to be
used in the work. The sample area shall be approved prior to
proceeding with fireproofing work in any other area. The approved
sample area shall be used as a reference standard for applied
fireproofing material. Sample area shall remain in place and open
to observation until all spray-applied fireproofing is completed
and accepted, at which time it may become part of the work.
SD-06 Test Reports
Fire Resistance Rating; G, [_____] [[____Division,][EFA ___]
Naval Facilities Engineering Command Fire Protection Engineer]
Reports and test records, attesting that the fireproofing
material conforms to the specified requirements. Each test report
shall conform to the report requirements specified by the test
method.
Field Tests[; G][; G, [_____]]
Test reports documenting results of tests on the applied
material in the project. Report shall include defects identified,
SD-07 Certificates
Installer Qualifications[; G][; G, [_____]]
Manufacturer's certification that each listed installer is
qualified and trained to install the specified fireproofing.
Evidence that each fireproofing installer has had a minimum of 3
years experience in installing the specified type of fireproofing.
Surface Preparation Report; G, [_____] [[____Division,][EFA ___]
Naval Facilities Engineering Command Fire Protection Engineer]
Manufacturer's certification that surfaces to be protected have
been inspected and are acceptable to receive spray-applied
fireproofing. The statement shall list the structural members and
the areas that have been inspected and certified.
Manufacturer's Inspection Report; G, [_____] [[____Division,][EFA
___] Naval Facilities Engineering Command Fire Protection Engineer]
Manufacturer's certification that the spray-applied fireproofing
in the entire project complies with the manufacturer's criteria
and recommendations.
1.3
DELIVERY AND STORAGE
Packaged material shall be delivered in the original unopened containers,
marked to show the brand name, the manufacturer, and the UL markings.
Fireproofing material shall be kept dry until ready to be used, and shall
be stored off the ground, under cover and away from damp surfaces. Damaged
or opened containers will be rejected. Material with shelf-life shall be
applied prior to expiration of the shelf-life.
SECTION 07810
Page 6