NOTE: The 20-year system weathertightness warranty,
required in paragraph c. below, will increase
construction cost, and should be used only after
consultation with the customer. Remove paragraph c.
below, if not required in the project.
**************************************************************************
The Contractor shall furnish, in writing, the following manufacturer's
material warranties which cover all SSSMR system components such as roof
panels, anchor clips and fasteners, flashing, accessories, and trim,
fabricated from coil material:
a. A manufacturer's 20 year material warranty warranting that the
aluminum, zinc-coated steel, aluminum-zinc alloy coated steel or
aluminum-coated steel as specified herein will not rupture,
structurally fail, fracture, deteriorate, or become perforated under
normal design atmospheric conditions and service design loads.
Liability under this warranty shall be limited exclusively to the cost
of either repairing or replacing nonconforming, ruptured, perforated,
or structurally failed coil material.
b. A manufacturer's 20 year exterior material finish warranty on the
factory colored finish warranting that the finish, under normal
atmospheric conditions at the site, will not crack, peel, or
delaminate; chalk in excess of a numerical rating of eight, as
determined by ASTM D 4214 test procedures; or change color in excess of
five CIE or Hunter Lab color difference (delta E) units in accordance
with ASTM D 2244. Liability under this warranty is exclusively limited
to refinishing with an air-drying version of the specified finish or
replacing the defective coated material.
c. A roofing system manufacturer's 20 year, non-prorated, system
weathertightness warranty.
1.8
COORDINATION MEETING
A coordination meeting shall be held 30 days prior to the first submittal,
for mutual understanding of the Structural Standing Seam Metal Roof (SSSMR)
System contract requirements. This meeting shall take place at the
building site and shall include representatives from the Contractor, the
roof system manufacturer, the roofing supplier, the erector, the SSSMR
design engineer of record, and the Contracting Officer. All items required
by paragraph SUBMITTALS shall be discussed, including applicable standard
manufacturer shop drawings, and the approval process. The Contractor shall
coordinate time and arrangements for the meeting.
PART 2
PRODUCTS
2.1
ROOF PANELS
**************************************************************************
NOTE: See TI 809-29 for guidance on roof slope and
height of seams.
**************************************************************************
Panels shall be [steel] [aluminum] and shall have a [factory color] [mill]
finish. Length of sheets shall be sufficient to cover the entire length of
any unbroken roof slope for slope lengths that do not exceed 9 m 30 feet.
When length of run exceeds 9 m 30 feet and panel laps are provided, each
SECTION 07416A
Page 15