nails in laps and where they rest on roof tiles.
g.
Where tiles join hip stringers they shall be made waterproof with
flashing cement.
h.
Voids at ends of hips and ridges shall be filled with mortar
colored to nearest match of tile color.
i.
Tile in contact with cement mortar shall be immersed in water for
at least 2 minutes before laying.
j.
Ridge angles and hip/ridge terminals shall be mitered on job,
nailed or wired, and set in plastic cement.
k.
When short course tiles are not otherwise specified for rafters
which do not accommodate full courses, they shall be cut and
drilled on job by roofer unless a plus or minus 25 mm 1 inch
adjustment of regular tile overhang at eave is sufficient.
-- End of Section --
SECTION 07320A
Page 16