following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-03 Product Data
Glass Block
Waterproofing Agent
Horizontal Joint Reinforcement
Expansion Strip
SD-04 Samples
Glass Block
Horizontal Joint Reinforcement
Expansion Strip
SD-07 Certificates
Glass Block
Certificates of compliance stating that the materials meet the
specified requirements.
1.3
DELIVERY, STORAGE, AND HANDLING
Deliver cement, lime, and other cementitious materials to the site in
unbroken containers, labeled with the manufacturers' names and brands.
Store mortar materials in a manner to prevent the inclusion of foreign
materials and damage by water or dampness. Avoid chipping and breakage of
masonry units. Protect glass block materials from contact with earth and
exposure to the weather, and keep dry until used. Do not use materials
containing frost or ice.
PART 2
PRODUCTS
2.1
GLASS BLOCK UNITS
**************************************************************************
NOTE: The desired physical characteristics (Light
transmittance, reflectivity, pattern, size, etc.)
should be described. Drawings will clearly show the
clearances required for deflection and expansion.
**************************************************************************