3.10
DEFECTIVE WORK
Defective work shall be repaired or replaced, as directed, using approved
procedures.
3.11
FINAL INSPECTION
Following completion of the work, the structure shall be inspected for
damage, staining, and other distresses. The patches shall be inspected for
cracking, crazing, delamination, unsoundness, staining and other defects.
The finish, texture, color and shade, and surface tolerances of the patches
shall be inspected to verify that all requirements have been met. All
surfaces exhibiting defects shall be repaired as directed.
-- End of Section --l
SECTION 03900
Page 27