1.2.2.3
Unit of Measure
Unit of measure: cubic meter yard.
1.2.3
[Bedding Concrete]
**************************************************************************
NOTE: If bedding concrete is to be paid for as a
separate bid item, delete the optional wording
"Bedding concrete and" in Bid Item "(1)
Roller-Compacted Concrete (RCC) in [_____]", above.
**************************************************************************
1.2.3.1
Payment
Payment will be made for costs associated with placing bedding concrete.
1.2.3.2
Measurement
Bedding concrete will be measurement for payment based upon the actual
volume of bedding concrete placed. The bedding concrete volume in cubic
meters yards will be computed from the mass weight of the material batched
at the batch plant using the theoretical mass per meter weight per yard as
determined from the design mixture. Any concrete which is wasted or placed
in violation of the specifications will not be measured for payment.
1.2.3.3
Unit of Measure
Unit of measure: cubic meter yard.
1.2.4
Portland Cement
1.2.4.1
Payment
Payment will be made for costs associated with Portland cement, which
includes the cost of required unloading, hauling, handling, and storage at
the site, of all portland cement used in the work for all of the concrete
bid items.
1.2.4.2
Measurement
Portland cement will be measured for payment based upon the number of tons
(metric) (2,000 pounds) of Portland cement used, excluding amount
specifically excepted, wasted, or used for the convenience of the
Contractor. The quantity to be paid for will be determined by multiplying
the approved batch mass in kg/cubic meter weight in pounds per cubic yard
of Portland cement in each type of concrete used by the number of cubic
meters yards of concrete types placed within the pay lines of the
structure, as determined in accordance with the concrete bid items, and
dividing by 1000 2,000.
1.2.4.3
Unit of Measure
Unit of measure: tons (metric) (2,000 pounds).