The petrographic examination shall be used to
identify deleterious substances in aggregates.
Deleterious substances shall be listed individually
with respective limits.
Depending upon the quality of aggregates available,
some tests may not be required. Refer to EM
1110-2-2000 for the purpose of each test.
**************************************************************************
a. Frequency of Quality Tests - Thirty days prior to the start of
preplaced-aggregate concrete placement the Contractor shall perform all
tests for aggregate quality listed on the following page. In addition,
after the start of concrete placement, the Contractor shall perform
tests for aggregate quality in accordance with the frequency schedule.
Samples of fine aggregate tested after the start of concrete placement
shall be taken immediately prior to entering the grout mixer. Samples
of coarse aggregate tested after the start of concrete placement shall
be taken immediately prior to entering the forms.
FREQUENCY
PROPERTY
FINE AGGREGATE
COARSE AGGREGATE
TEST
Specific Gravity
Every 3 months
Every 3 months
ASTM C 127
ASTM C 128
Absorption
Every 3 months
Every 3 months
ASTM C 127
ASTM C 128
[Durability Factor
Every 12 months
Every 12 months
COE CRD-C 114
using, Procedure A
ASTM C 666/C 666M]
[Clay Lumps and
Every 3 months
Every 3 months
ASTM C 142]
Friable Particles
[Material Finer
Every 3 months
Every 3 months
ASTM C 117]
than the 75 m
(No. 200) Sieve
Every 3 months
Not applicable
ASTM C 40
ASTM C 87)]
[L.A. Abrasion
Not applicable
Every 6 months
ASTM C 131
ASTM C 535]
[Soft and Friable
Not applicable
Every 6 months
COE CRD-C 130]
[Petrographic
Every 6 months
Every 6 months
ASTM C 295]
Examination
[Chert, less than
Every 6 months
Every 6 months
ASTM C 123
2.40 specific
gravity]
[Coal and Lignite,
Every 6 months
Every 6 months
ASTM C 123
less than 2.00
SECTION 03372