cubic meter, yard, shall be recorded on the batching ticket and delivered
to the Contracting Officer prior to placement during the shift. The
Contracting Officer will have the option to request additional aggregate
moisture content tests for each of the required tests.
3.7.3
Grading
The grading of the coarse and fine aggregate shall be determined in
accordance with ASTM C 136. The fine and coarse aggregate grading shall be
determined prior to batching the shotcrete and at least once during a shift
in which shotcrete is being batched. The Contracting Officer will have the
option to require one additional sieve analysis test for aggregate type.
3.7.4
Thickness
The minimum shotcrete thickness shall be as shown in the drawings. The
unhardened shotcrete shall be checked for thickness using a probe by the
nozzleman or laborer at the time of placement. These thickness checks
shall be at 15-minute intervals and all low or thin areas shall be
corrected by applying additional shotcrete.
3.7.5
Mixture Proportions
Record and check mixture proportions at least once per shift for weigh
batching. Record and check mixture proportions as recommended by ASTM C
685/C 685M at least once per shift for volumetric batching and continuous
mixing plants.
3.7.6
Preparations
Prior to each placement of shotcrete, the Contractor's inspector shall
certify in writing or by an approved checkout form that cleanup and
preparations are in accordance with the plans and specifications.
3.7.7
[Air Content
Air content tests shall be conducted on wet-mix shotcrete according to ASTM
C 231 with a frequency of not less than once each shift nor less than once
for each 40 cubic meters 50 cubic yards of shotcrete placed through the
nozzle. Tests shall be conducted on samples taken as the wet shotcrete
mixture is placed in the delivery equipment.]
-- End of Section --