For submittals requiring Government approval on Army
projects, a code of up to three characters within
the submittal tags may be used following the "G"
designation to indicate the approving authority.
Codes for Army projects using the Resident
Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Shop Drawings
Drawings and design computations for all formwork required shall
be submitted at least [_____] days either before fabrication on
site or before delivery of prefabricated forms. If reshoring is
permitted, the method, including location, order, and time of
erection and removal shall also be submitted for review.
SD-03 Product Data
Materials
Manufacturer's literature shall be submitted for plywood,
concrete form hard board, form accessories, prefabricated forms,[
and] form coating[, and form-lining materials].
SD-04 Samples
Sample Panels[; G][; G, [_____]]
After shop drawings have been reviewed, sample panels for Class
A finish with applied architectural treatment shall be built on
the project site where directed.
SD-06 Test Reports
**************************************************************************
NOTE: If form removal is not allowed before 24
hours, the submittal, "Formwork Not Supporting
Weight of Concrete; G", and the corresponding