3-horizontal-to-1 vertical shall not be rolled.
3.2.5
Finishing
A minimum 25 percent of the installed sprigs shall extend above the ground
surface upon completion of the sprigging operation.
3.2.6
Erosion Control Material
Install in accordance with manufacturer's instructions, where indicated or
as directed by the Contracting Officer.
3.2.7
Watering Sprigs
Watering shall be started immediately after completing each day of
sprigging. Water shall be applied at a rate sufficient to ensure moist
soil conditions to a minimum 25 mm 1 inch depth. Run-off, puddling, and
wilting shall be prevented. Unless otherwise directed, watering trucks
shall not be driven over turf areas. Watering of other adjacent areas or
plant material shall be prevented.
3.3
PROTECTION OF TURF AREAS
Immediately after turfing, protect area against traffic and other use.
3.4
Restore to original condition existing turf areas which have been damaged
during turf installation operations. Keep clean at all times at least one
paved pedestrian access route and one paved vehicular access route to each
building. Clean other paving when work in adjacent areas is complete.
-- End of Section --