context of the project.
For submittals requiring Government approval on Army
projects, a code of up to three characters within
the submittal tags may be used following the "G"
designation to indicate the approving authority.
Codes for Army projects using the Resident
Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
State Landscape Contractor's License & Tree Relocation References
Permits
Photographs
SD-02 Shop Drawings
Transplanting Plan
SD-03 Product Data
Equipment
A listing of equipment to be used for the transplanting
operation,including size model, year and type of mechanical tree
transplanting equipment.
SD-06 Test Reports
Soil Test; [Soil Test of current growing area]; [Soil Test of
proposed area]; [Soil Test location map]
Percolation Test; [Percolation Test of current growing area];
[Percolation Test of proposed area]
SECTION 02915
Page 6