TABLE VI
SURFACE-SNOOTHNESS TOLERANCES
Direction
Resin Modified Pavement
of Testing
Tolerance, inch
-----------------------------------------------------------------
Longitudinal
1/4
Transverse
1/4
3.16.3.1
Thickness
The thickness of the RMP shall meet the requirements shown on the contract
drawings. The measured thickness of the RMP shall not exceed the design
thickness by more than 13 mm 1/2 inch, or be deficient in thickness by more
than 6 mm 1/4 inch.
3.16.3.2
Surface Smoothness
Finished surfaces shall not deviate from testing edge of a 3.7 meter 12 foot
straightedge more than the tolerances shown for the respective pavement
category in Table VI.
3.16.3.3
Surface Texture
The surface texture shall be uniform and free of excess cement grout.
Finished surface shall have all grout removed below the top of the
open-graded asphalt concrete.
3.16.3.4
Grade
The finished surface of pavement shall conform to the elevations and the
cross sections shown and shall vary not more than 15 mm 0.6 inch from the
plan grade established and approved at site of work. Finished surfaces at
juncture with other pavements shall coincide with finished surfaces of
abutting pavements.