considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-04 Samples
Job Mix Formula for Slurry Grout
Materials required to produce the open graded asphalt mixture
and slurry grout job-mix-formulas in the quantities indicated
below.
Aggregates representing each stockpile to be used in the
production of the open-graded asphalt mixture:
45 kg 100
pounds each
Bituminous Material
19 liters 5 gallons
Slurry Grout Sand
23 kg 50 pounds
Fly Ash
23 kg 50 pounds
Cement
23 kg 50 pounds
Cross Polymer Resin
4 liters l gallon
Samples shall be delivered, along with the Contractor's
to U.S. Army Engineer Waterways Experiment Station Research and
Development Center, 3909 Halls Ferry Road, Vicksburg, Mississippi,
39180-6199, ATTN: CEWESERD-GP-Q.
SD-06 Test Reports
Coarse Aggregate[; G][; G, [_____]]
Coarse and Fine Aggregates[; G][; G, [_____]]
Open-Graded Mix Aggregate[; G][; G, [_____]]
Bituminous Material[; G][; G, [_____]], [____]
Slurry Grout Sand[; G][; G, [_____]]
Filler (Fly Ash)[; G][; G, [_____]]
Job Mix Formula for Slurry Grout[; G][; G, [_____]]
Contractor Quality Control[; G][; G, [_____]]
Aggregate and QC test results. Slurry grout viscosity tests
shall be conducted immediately prior to application on the
pavement surface and 30 minutes thereafter.
SD-07 Certificates
Cement[; G][; G, [_____]]
Cross Polymer Resin[; G][; G, [_____]]
Curing Compound[; G][; G, [_____]]
Copies of certificates.
SECTION 02746
Page 7