QUANTITIES (PER SQUARE YARD
[FOR SINGLE SURFACE TREATMENT]
Bituminous
Material
Aggregate
No.
(Liter)
(Kilograms)
__________
____________
_______________
QUANTITIES (PER SQUARE METER)
[FOR DOUBLE SURFACE TREATMENT]
Bituminous
Bituminous
Material
Aggregate
Material
Aggregate
(Liters)
(Kilograms)
(Liters)
(Kilograms)
First
First
Second
Second
No.
Application
Spreading
Application
Application
_________
___________
_________
___________
___________
1
0.70-1.10
12-15
--
--
2
--
--
0.70-1.10
9-11
3
0.50-0.70
9-11
--
--
4
--
--
0.50-0.70
4-6
QUANTITIES (PER SQUARE YARD)
[FOR DOUBLE SURFACE TREATMENT]
Bituminous
Bituminous
Material
Aggregate
Material
Aggregate
(Liters)
(Kilograms)
(Liters)
(Kilograms)
First
First
Second
Second
No.
Application
Spreading
Application
Application
_________
___________
_________
___________
___________
1
0.20-0.30
28-34
--
--
2
--
--
0.20-0.30
20-25
3
0.15-0.20
20-25
--
--
4
--
--
0.15-0.20
10-15
1.3
PAYMENT
**************************************************************************
NOTE: Delete this paragraph when lump-sum bidding
is used.
**************************************************************************
The quantities of aggregates and bituminous material, determined as
specified in paragraph MEASUREMENT FOR PAYMENT, will be paid for at the
respective contract unit prices, which payment shall constitute full
compensation for all operations necessary to complete the work as specified
herein.
1.4
WAYBILLS AND DELIVERY TICKETS
Before the final statement is allowed, the Contractor shall file with the
Contracting Officer certified waybills and delivery tickets for aggregate
and bituminous material used in the bituminous surface treatment. The
Contractor shall not remove bituminous material from the tank car or
storage tank until initial outage and temperature measurements have been
SECTION 02745
Page 6