materials are sorted and processed.
1.5.3
Other Methods.
Other methods proposed by the Contractor may be used when approved by the
Contracting Officer.
1.6
DISPOSAL
Except as otherwise specified in other sections of the specifications,
disposal shall be in accordance with the following:
1.6.1
Reuse.
First consideration shall be given to salvage for reuse since little or no
re-processing is necessary for this method, and less pollution is created
when items are reused in their original form. Sale or donation of waste
suitable for reuse shall be considered. Salvaged materials, other than
those specified in other sections to be salvaged and reinstalled, shall not
be used in this project.
1.6.2
Recycle.
Waste materials not suitable for reuse, but having value as being
recyclable, shall be made available for recycling whenever economically
feasible.
1.6.3
Waste.
**************************************************************************
NOTE: Disposal by landfill or incineration on the
installation should not be provided as a "no Cost"
item. If necessary to use such facilities the
Contractor should be charged the prevailing
commercial rate.
**************************************************************************
Materials with no practical use or economic benefit shall be disposed at a
landfill or incinerator.
-- End of Section --
SECTION 01572
Page 5