contract because the names of the Contractors must
be give on the NOI.
(2) After construction is completed, a Notice of
Termination (NOT) must be sent to the state office
or Regional USEPA Regional Office.
**************************************************************************
PART 1
GENERAL
1.1
REFERENCES
**************************************************************************
NOTE: Issue (date) of references included in
provided by the latest guide specification. Use of
SpecsIntact automated reference checking is
recommended for projects based on older guide
specifications.
**************************************************************************
The publications listed below form a part of this specification to the
extent referenced. The publications are referred to within the text by the
basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D 4439
(2004) Geosynthetics
ASTM D 4491
by Permittivity
ASTM D 4533
(1991; R 1996) Trapezoid Tearing Strength
of Geotextiles
ASTM D 4632
(1991; R 2003) Grab Breaking Load and
ASTM D 4751
(1999a) Determining Apparent Opening Size
of a Geotextile
ASTM D 4873
(2002) Identification, Storage, and
Handling of Geosynthetic Rolls and Samples
1.2
GENERAL
The Contractor shall implement the storm water pollution prevention
measures specified in this section in a manner which will meet the
requirements of Section 01355A ENVIRONMENTAL PROTECTION, and the
requirements of the National Pollution Discharge Elimination System (NPDES)
permit attached to that Section.
1.3
SUBMITTALS
**************************************************************************
NOTE: Submittals must be limited to those necessary
for adequate quality control. The importance of an
item in the project should be one of the primary
factors in determining if a submittal for the item
SECTION 01356A