1.9
QUALITY ASSURANCE
1.9.1
Lists of Prior Installations
Submit within 30 days after award and prior to commencement of
installation, a certificate containing the following information:
a.
A list of at least three installations meeting requirements set
forth in paragraph entitled "Operating Experience."
b.
Owner and location of each installation.
c.
Date of owner acceptance of each installation.
d.
Collector model number.
e.
Design inlet gas volume, L/s acfm.
f.
Design inlet gas temperature, degrees C F.
g.
Design inlet dust loading, grams per liter grains per acf.
h.
Design outlet dust loading grams per liter grains per acf.
i.
Type of [coal-fired] [oil-fired] [boiler] [refuse-fired waste
disposal incinerator].
1.9.2
Certification of Testing Capability
Certify that the factory is capable of performing electrical integrity
tests of 1000 volts for hopper heater modules, blanket or tape.
1.9.3
Submit test.
1.10
BID FORMS
ICAC M-4 evaluation bid forms.
1.11
DELIVERY AND ASSEMBLY
Ship equipment completely factory-assembled, except when physical size,
arrangement, or configuration of the equipment, or shipping limitations,
makes the shipment of completely assembled equipment impracticable, in
which case assemble equipment and ship as shown on the approved shop
drawings. The Contractor is responsible for all costs encountered in the
field for assembly of sections, accessories, or appurtenances not listed in
the proposal as requiring field assembly.
1.11.1
Coordination
Contractor shall ensure that design parameters of collector are coordinated
by dust collector manufacturer with manufacturers of system equipment and
installing contractor of ductwork with gas distribution devices which will
interface with, and optimize system operation.
SECTION 15861N
Page 11