Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Include penetration details. The shop drawings for the shielded
enclosures shall be prepared by a shielding manufacturer/
fabricator experienced in the installation of metal welded
has supervised the installation of two such enclosures which have
operated satisfactorily. Prior to commencing work, and as a
condition of continuing work, forward to the Contacting Officer
information demonstrating such experience. [Drawings shall be
approved by and bear the seal of a registered, professional
structural engineer.]
SD-03 Product Data
Telephone and signal line filters
Shielded air vents
Door assemblies
SD-06 Test Reports
**************************************************************************
NOTE: When specifying nonlatching doors, delete
door static load and sag tests and cycle test for
door latches. Retain cycle test for door hinges.
**************************************************************************
Door static load test
Door sag test
Swinging door closure test
SELDS seam tests
For SELDS seam testing, include location of the permanent test
leads.